跳转至

Historical Part 11 Mock Trial Example

This file is retained as historical validation example material for the open-source baseline.

It is not a live operational record for downstream adopters and should not be copied into a production QMS unchanged.

Trial Plan

  1. Merge PR linked to Issue #27.
  2. Wait for the post-merge signature workflow to post role-based sign links on the closed PR.
  3. Signatory A (Quality Assurance Lead) signs and auto-posts attestation.
  4. Signatory B (Management Representative) signs and auto-posts attestation.
  5. Verify the signature gate succeeds.

Expected Evidence

  • Closed PR comments containing two attestation payloads.
  • Successful post-merge signature gate on the merged commit hash.