Historical Part 11 Mock Trial Example¶
This file is retained as historical validation example material for the open-source baseline.
It is not a live operational record for downstream adopters and should not be copied into a production QMS unchanged.
Trial Plan¶
- Merge PR linked to Issue #27.
- Wait for the post-merge signature workflow to post role-based sign links on the closed PR.
- Signatory A (
Quality Assurance Lead) signs and auto-posts attestation. - Signatory B (
Management Representative) signs and auto-posts attestation. - Verify the signature gate succeeds.
Expected Evidence¶
- Closed PR comments containing two attestation payloads.
- Successful post-merge signature gate on the merged commit hash.