WI 001 VerificationAndValidationExecution
1. Purpose¶
Define the default GitHub workflow for preparing test cases, approving and signing test plans, executing approved test plans, and reviewing/signing V&V evidence and reports.
2. Scope¶
Applies to software verification, software validation, and usability-validation activities that require controlled evidence.
3. Procedure¶
3.1 Initiate the V&V Campaign¶
- Open a GitHub issue using
.github/ISSUE_TEMPLATE/verification_validation_plan.yml. - Use the issue for coordination only: scope, target build or commit, owners, linked requirements/risk items, and done criteria.
- Do not treat the issue body alone as the approved V&V record.
3.2 Prepare Controlled Test Cases¶
- Use stable test-case identifiers (
TC-...) for both automated and manual tests. - Automated test cases remain near code; the controlled record references repository path, command, and exact commit or tag.
- Manual or mixed tests are maintained as controlled records in the designated product/study repository, typically using templates derived from this upstream repository's
records/verification_validation/. - Each test case must define objective, requirement links, risk-control links, preconditions, steps or script reference, expected result, and evidence type.
3.3 Approve the Test Plan¶
- Open a PR that commits or updates:
- a
vv_plan_template.yml-derived plan record in the target repository - test case index
- any new or revised manual test case records in the target repository
- The PR body must state:
**Meaning of Signature:** Approved V&V Plan**Signer Roles:** Quality Assurance Lead; Engineering Lead**Required Signatures:** 2- Merge only after required approvals on the current head commit.
- After merge, the merged PR is PIN-signed through the standard signature flow. That post-merge attestation is the formal approval of the plan baseline.
- Branch-only plan or test-record drafts may be reviewed and iterated, but they are not controlled approved plan baselines until the PR is merged.
3.4 Execute the Approved Plan¶
- Dry-run or exploratory execution may occur before the formal release-readiness gate, but those runs are not the controlled release-evidence set.
- Formal release-candidate V&V begins only after the approved release-readiness decision names:
- the candidate revision or cutoff on
main - the included/deferred change set
- the binary or deployment package entering formal V&V
- Every controlled execution run containing one or more tests must begin by recording the exact execution configuration before the first test starts, including:
- operating system or platform version
- hardware model, host, or device under test
- environment or deployment name
- binary, image, or package identifier under test
- any supporting software or dependency versions needed to reproduce the run
- Execute only against the recorded configuration for that run.
- Automated evidence may be generated in GitHub Actions or other validated tooling, but the controlled record must capture the exact job/run or artifact reference.
- Manual execution results are recorded in the designated product/study repository using the execution log template or an equivalent controlled derivative.
- Deviations or failed results are logged immediately and linked to defects, nonconformities, CAPA, or change actions as applicable.
- If the binary or deployment package changes after formal execution has started, open a new controlled execution run with a new configuration capture and reassess the required regression scope before using the new results for release.
3.5 Review and Sign Evidence and the V&V Report¶
- Open a second PR that commits:
- execution log
- evidence index
- deviation log or linked deviation summary
- V&V report with release recommendation or restriction
- The executor must not be the sole approver of this PR.
- The PR body must state:
**Meaning of Signature:** Approved V&V Evidence and Report**Signer Roles:** Quality Assurance Lead; Engineering Lead**Required Signatures:** 2- After merge, collect the post-merge PIN-based signature attestation on the merged PR.
- Route the approved V&V report into the final release-decision gate defined in WI-002 before shipment authorization.
- Publish the immutable release package and link it from the MDF, risk records, usability records, and release baseline as applicable.
3.6 Change Control and Re-Execution¶
- If planned scope, environment, or acceptance criteria change, revise the plan through a new PR before further execution.
- If test outcomes invalidate prior approval assumptions, reopen affected risk, change, or release decisions before shipment.
- Individual engineers may execute tests and prepare evidence, but the engineering lead remains accountable for plan completeness, evidence disposition, and routing into release decisions.
4. Required Records¶
- V&V planning issue
- Approved V&V plan record and test case index in the designated product/study repository
- Test execution log with per-run configuration capture and evidence index
- Deviation log
- V&V report with signed approval evidence
5. Revision History¶
| Revision | Revision Date | Change Summary |
|---|---|---|
| R00 | 2026-03-06 | Initial release defining GitHub-native V&V execution flow. |
| R01 | 2026-03-06 | Clarified that product V&V execution records are maintained in designated product/study repositories using QMS Lite templates as the default baseline. |
| R02 | 2026-03-07 | Normalized V&V signoff accountability to the engineering owner role while keeping engineers as the minimum trained execution role. |
| R03 | 2026-03-07 | Renamed the accountable technical signoff role to engineering_lead. |
| R04 | 2026-03-07 | Distinguished dry runs from formal release-candidate V&V, required approved release-readiness entry before formal execution, and made per-run configuration capture mandatory. |
| R05 | 2026-03-07 | Explicitly routed the approved V&V report into the separate final release-decision gate before shipment authorization. |
| R06 | 2026-03-07 | Clarified that branch-only plan and test-record drafts remain uncontrolled until the approving PR is merged. |
| R07 | 2026-03-07 | Removed overly specific signature-regulation terminology from the V&V signature wording and used technology-neutral language. |
| R08 | 2026-03-10 | Updated upstream template-baseline naming references for product V&V execution records. |
| R09 | 2026-04-27 | Renamed YAML metadata field effective_date to revision_date to align controlled-document metadata with the tag-based publication model. The effective date is derived from the published QMS release tag rather than from the document front matter. |