SOP 009 ChangeManagement
1. Purpose¶
Define controlled change evaluation, approval, implementation, and verification for QMS and product artifacts.
2. Scope¶
Applies to procedural, tooling, product, infrastructure, supplier, and regulatory-impacting changes.
3. Inputs¶
- Change request or issue
- Impact/risk assessment
- Existing baseline artifacts
4. Outputs¶
- Approved change record and implementation evidence
- Updated controlled documents and training assignments
5. Roles and Responsibilities¶
| Role | Responsibilities |
|---|---|
| Change Owner | Prepares change rationale, scope, and implementation plan. |
| QA Lead | Reviews compliance and traceability impacts and executes product-regulatory changes within the integrated quality/regulatory domain. |
| Management Representative | Approves significant QMS/regulatory-impacting changes. |
| Engineering Lead / Technical QMS Maintainer | Execute and verify change within their assigned domain. |
6. Procedure¶
6.1 Change Classification¶
Classify each change as one or more of:
1. QMS-document/process
2. Product design/software
3. Infrastructure/operations
4. Supplier/external dependency
6.2 Impact Assessment¶
- Assess impact on safety/performance, compliance, and record integrity.
- Determine affected SOPs, training, tests, risks, and regulatory submissions.
- Define rollback/containment approach for high-risk changes.
- For software changes, determine whether configuration baseline, release manifest, or software safety classification updates are required.
- Assess impact on released products, including the need for field action, customer communication, or regulatory reporting.
- Where applicable, evaluate impact on the risk management file, including hazard analysis, cybersecurity risks, risk controls, and residual risk acceptability.
- For medical device software, record the clinical impact screening outcome required by
SOP-025 §6.13(4)in the change record, and decide whether the notified body must be informed before the change is introduced (SOP-025 §6.13(5)). A change to the intended purpose or claims always triggers reassessment of classification, risk, and the clinical evaluation (SOP-025 §6.2(6)).
6.3 Approval¶
- Minor changes: QA Lead approval.
- Major/regulatory-impacting changes: QA Lead + Management Representative approval.
- Approval must occur before implementation in controlled baseline.
6.4 Implementation and Verification¶
- Implement via PR with evidence and either a linked issue reference or sufficient change context stated directly in the PR.
- Execute required verification and, where applicable, validation activities and attach objective evidence.
- Update the published controlled-document index and training matrix where applicable.
- Branch implementations may be used for collaboration and interim verification, but branch-only state is draft/uncontrolled until merged to the controlled
mainbaseline. - Multiple approved software changes may progress in parallel on the product
mainbranch; merge alone does not imply inclusion in the next release. - Software release-affecting changes must update the release-readiness and release-baseline records defined in SOP-020 and WI-002.
- Software changes shall be controlled within defined configuration baselines and release processes in accordance with SOP-020.
6.5 Closure¶
- Confirm all impacted artifacts are updated and approved.
- Confirm post-change effectiveness indicators are stable.
- Close change record with linkage to release and traceability artifacts.
7. Required Records¶
- Change request and impact assessment
- Approval evidence
- Verification evidence and closure summary
8. Traceability¶
| Standard Clause | Control in this SOP |
|---|---|
| ISO 13485:2016 4.1.4 | Defines control of QMS process changes and their effect on conformity. |
| ISO 13485:2016 7.3.9 | Defines control of design/development changes. |
9. Related Controlled Documents¶
- SOP-001 Document and Record Control
- SOP-008 Design and Development Control
- SOP-011 Competence, Training, and Awareness
- SOP-020 Software Lifecycle, Configuration, and Release Management (IEC 62304:2006+A1:2015)
- SOP-025 Clinical Evaluation and Post-Market Clinical Follow-up
- WI-002 Configuration and Release Management Execution
10. Revision History¶
| Revision | Revision Date | Change Summary |
|---|---|---|
| R00 | 2026-03-02 | Initial full release. |
| R01 | 2026-03-06 | Added software baseline and release-manifest impact controls for regulated software changes. |
| R02 | 2026-03-07 | Normalized change-execution responsibilities to the controlled small-team role model. |
| R03 | 2026-03-07 | Renamed change-execution roles to the simplified engineering_lead and regulatory_lead taxonomy. |
| R04 | 2026-03-07 | Clarified that multiple software changes may proceed in parallel on product main, and that formal release inclusion is decided later through the controlled release-readiness gate. |
| R05 | 2026-03-07 | Clarified that branch-only implementations remain uncontrolled draft state and that PRs may provide the controlled change context directly when no separate issue is used. |
| R06 | 2026-03-08 | Generalized change-control follow-up from the published SOP index to the published controlled-document index. |
| R07 | 2026-03-18 | Removed top-table standards clause metadata; normative references remain in the Traceability section. |
| R08 | 2026-03-25 | Added released-product and risk-file impact assessment expectations and strengthened V&V plus release-baseline implementation controls. |
| R09 | 2026-03-27 | Consolidated the standalone regulatory-lead execution role into the QA-lead change domain and removed the redundant separate role reference. |
| R10 | 2026-04-27 | Renamed YAML metadata field effective_date to revision_date to align controlled-document metadata with the tag-based publication model. The effective date is derived from the published QMS release tag rather than from the document front matter. |
| R11 | 2026-05-04 | Standardize standards citations to specific versions. |
| R12 | 2026-11-20 | Added the SOP-025 clinical impact screening and notified body information decision to the impact assessment for medical device software changes. |