跳转至

SOP 010 SupplierAndPurchasingControl

1. Purpose

Define selection, qualification, monitoring, and re-evaluation of suppliers and outsourced processes affecting product quality or QMS compliance.

2. Scope

Applies to all external providers of software components, cloud services, consulting, testing, and quality-critical operational support.

3. Inputs

  • Supplier service description and criticality assessment
  • Qualification evidence and due diligence
  • Quality agreement or accepted SLA/Terms of Service equivalent, plus purchasing requirements

4. Outputs

  • Approved Supplier List (ASL)
  • Supplier performance and re-evaluation records
  • Controlled purchasing specifications

5. Roles and Responsibilities

Role Responsibilities
Management Representative Owns supplier governance framework and ASL approvals.
QA Lead Verifies supplier controls and evidence quality.
Requesting Owner Defines technical requirements and monitors delivery quality.

6. Procedure

6.1 Supplier Criticality Classification

  1. Classify supplier as critical, major, or minor based on impact on product quality, patient safety, data integrity, and QMS compliance.
  2. Critical suppliers require enhanced qualification and periodic review.
  3. Supplier-provided products or services shall be evaluated for their impact on the product risk management file(s), including hazard introduction and risk control dependencies.

6.2 Qualification and Vetting

  1. Complete supplier vetting template at onboarding.
  2. Evaluate competence, security/privacy posture, continuity, compliance history, and any patient safety or data-integrity dependencies introduced by the supplied service.
  3. Outsourced processes affecting product conformity shall be controlled by ACME GmbH, including defined responsibilities, oversight, and verification of outputs.
  4. For cloud-based providers, independent technical assurance evidence (e.g. ISO 27001 certification, SOC 2 reporting, or equivalent) shall be obtained where available. Where such certification is not available, alternative evidence of adequate security, reliability, and data protection controls shall be evaluated and justified based on supplier criticality.

6.3 Approved Supplier List Maintenance

  1. Record approved suppliers in the designated product/study record repository.
  2. ASL fields must include service scope, criticality, approval date, and next review date.
  3. Procurement from non-approved critical suppliers is prohibited unless documented temporary waiver is approved.

6.4 Purchasing Controls

  1. Purchase requirements must define expected quality/compliance deliverables.
  2. Quality agreements are required for critical suppliers unless a hyperscale vendor provides only standard SLAs and Terms of Service; in that case, documented acceptance of those terms as a functional equivalent is permitted when justified and approved by QA and Management Representative.
  3. Supplier deliverables must be reviewed against acceptance criteria.

6.5 Ongoing Monitoring and Re-evaluation

  1. Monitor supplier performance (service quality, incidents, SLA breaches, audit outcomes).
  2. Re-evaluate critical suppliers at least annually.
  3. Remove/suspend suppliers from ASL if controls are no longer adequate.
  4. Re-evaluation shall also be triggered by significant changes, incidents, nonconformities, or performance issues.

7. Required Records

  • Supplier vetting forms in the designated product/study record repository
  • Approved supplier list
  • Supplier performance reviews and decisions

8. Traceability

Standard Clause Control in this SOP
ISO 13485:2016 4.1.5 Defines control of outsourced processes affecting conformity.
ISO 13485:2016 7.4.1 Defines supplier evaluation and selection criteria.
ISO 13485:2016 7.4.2 Defines purchasing information/requirements control.
ISO 13485:2016 7.4.3 Defines verification of purchased product/service conformity.
  • SOP-009 Change Management
  • SOP-017 Infrastructure and Maintenance Control

10. Revision History

Revision Revision Date Change Summary
R00 2026-03-02 Initial full release.
R01 2026-03-05 Updated supplier record-location control to designated product/study repositories instead of qms-lite local record paths.
R02 2026-03-18 Removed top-table standards clause metadata and expanded supplier criticality, cloud certification, and hyperscale SLA/Terms of Service purchasing controls.
R03 2026-03-25 Added supplier risk-file impact, outsourced-process oversight, proportionate cloud assurance evidence, and event-triggered re-evaluation controls.
R04 2026-04-27 Renamed YAML metadata field effective_date to revision_date to align controlled-document metadata with the tag-based publication model. The effective date is derived from the published QMS release tag rather than from the document front matter.
R05 2026-05-04 Standardize standards citations to specific versions.