Design and Development Plan Template¶
This template shows one workable Markdown-first variant of a design and development plan for a GitHub-native team.
You may rewrite the section order, headings, tables, or prose style to fit the product, as long as the same planning decisions, gate reviews, linked records, and approval intent remain clear and traceable.
Instantiated product records are expected to be Markdown files with YAML frontmatter so they render directly in GitHub while still exposing structured metadata for automation.
Replace all example text below with product-specific content before approval.
1. Purpose and Scope¶
Example:
- Product / subsystem in scope:
ACME-GENERIC-SAMDclinical decision support web application and supporting API - Intended use summary: provide rule-based decision support to trained clinical staff in outpatient triage workflows
- Major feature or change boundary: initial regulated baseline for product launch, including core workflow, audit trail, and role-based access
- Out of scope: billing integrations, analytics dashboards, and non-clinical admin tooling
2. Lifecycle Model and Governance¶
Example:
- Lifecycle model: incremental delivery on protected
main, with formal baseline and release gates - Controlled lifecycle gates: design planning and input baseline; verification readiness; release readiness
- Software safety classification and rationale: class
Bper IEC 62304 because incorrect or unavailable output could contribute to delayed or incorrect clinical decisions if not mitigated - Product classification and regulatory pathway are documented separately in the product classification decision; do not treat software safety classification as the same decision
- Required controlled deliverables across the lifecycle: Gate 1 design-input baseline records; later architecture and traceability records; separate risk-management and verification/validation plan records; release-readiness, release-baseline, and final-release records; and medical device file references where the product maintains an MDF
3. Roles and Responsibilities¶
Example:
- Engineering lead: owns technical planning, architecture, release readiness, and technical traceability
- QA lead: owns intended use, claims, classification rationale, dossier coherence, process conformance, gate completeness, and approval evidence
- Usability lead: owns user-profile, critical-task, and formative/summative input for user-facing features
- Additional contributors or specialist reviewers: security reviewer for authentication and access control; clinical advisor for validation context
4. GitHub-Native Working Model¶
Example:
- Designated repository and default protected branch: product repository on protected
main - Change context convention: every controlled change starts from either a planning issue or a PR body that states the regulated change context
- Branch and pull request workflow: short-lived feature branches, PR review on current head, merge to
main, post-merge signature attestation, immutable release evidence - Required approvals and signature flow: gate PRs require designated role approvals and post-merge signatures per the QMS workflow
- Traceability and evidence locations: design records in
records/design/, risk records inrecords/risk/, V&V records inrecords/verification_validation/, release records inrecords/configuration/, MDF index inrecords/mdf/
5. Design Inputs and Baseline Content¶
Example:
- Intended use reference:
records/mdf/intended_use.md - User needs reference:
records/design/user_needs.md - System requirements reference:
records/design/system_requirements_spec.md - Classification decision reference:
records/mdf/classification_decision.mdwhen the product regulatory pathway or market classification is in scope for the baseline - Initial risk management plan reference:
records/risk/risk_management_plan.md - Privacy applicability and processing activity reference:
records/privacy/processing_activity_register.mdwhen personal data is processed, or documented not-in-scope rationale when no personal data is processed - DPIA screening reference:
records/privacy/dpia_screening.mdwhen personal data is processed or the design introduces privacy-relevant data flows - Planned V&V strategy reference:
records/verification_validation/vv_plan.mdor equivalent approved product record - Usability inputs and critical-task references:
records/usability/usability_file_index.md - Open constraints or deferred inputs: external SSO provider not finalized; production hosting region pending supplier contract review
6. Gated Review Record Set¶
6.1 Gate 1: Design Planning and Input Baseline¶
Example minimum review set:
- Design and development plan
- Intended use or equivalent scope statement
- Classification decision when product classification or jurisdictional pathway is already part of the baseline scope
- User needs
- System requirements baseline
- Initial risk management plan or approved risk-planning reference
- Privacy applicability decision and DPIA screening, when personal data is in scope
- Planned V&V strategy or approved V&V plan reference
- Usability file index or equivalent input reference for user-facing products
Example gate decision:
- Controlled implementation may start only after this gate is approved.
6.2 Gate 2: Verification Readiness¶
Example minimum review set:
- Current software architecture specification
- Current design traceability matrix
- Approved verification and validation plan
- Test case index and any required manual test records
- Release-readiness or formal V&V-entry decision reference
- Current risk register or risk-control references
- Open anomaly, deviation, and change summary relevant to the candidate scope
Example gate decision:
- Formal verification and validation execution may start only after this gate is approved and the exact candidate scope and binary or deployment are recorded.
6.3 Gate 3: Release Readiness¶
Example minimum review set:
- Approved V&V report and linked execution records
- Residual risk review or risk management review decision
- Open anomaly or deviation disposition summary
- Release baseline manifest
- Final release decision record
- Medical device file index and traceability summary references
- Post-market, complaint, incident, or cybersecurity follow-up references when applicable
Example gate decision:
- Product release may proceed only after this gate is approved.
7. Standard Planning Areas Covered by This SDP¶
7.1 Development Deliverables and Reviews¶
Example:
- Planned requirements, architecture, implementation, and traceability outputs: user needs, SRS, architecture spec, traceability matrix, risk file, V&V records, release records
- Review cadence and independence expectations: architecture reviewed before formal V&V planning; regulated gate PRs reviewed by non-author approvers on current head
- Acceptance approach for major output types: requirements accepted when testable and linked; architecture accepted when interfaces and dependencies are allocated; release accepted only after approved V&V and residual-risk review
7.2 Configuration and Baseline Management¶
Example:
- Configuration items to be controlled: repository revision, build or deployment package, requirements/risk/test record revisions, release manifest
- Baseline identification method: merged PRs establish approved content on
main; explicit release records define the candidate and shipped baseline - Release tag or versioning approach: semantic product version plus immutable Git commit and release tag
- Rollback or containment expectations: every release candidate defines rollback target, rollback trigger, and containment actions for failed deployment or post-release issue discovery
7.3 External Dependencies and SOUP-Like Components¶
Example:
- Known external components or services in scope: managed database, identity provider, GitHub Actions, selected open-source libraries
- Evaluation and approval approach: document intended use, version or service, rationale, and risk/review impact in architecture and supplier or change records
- Change-impact expectations for dependency updates: significant upgrades require impact review on requirements, risk, V&V scope, and release readiness
7.4 Maintenance and Problem Resolution¶
Example:
- Expected anomaly intake path: issue intake through product defects, complaint records, incident records, or PMS findings
- Defect triage and escalation approach: pre-milestone defects remain standard engineering defects; post-milestone quality issues route through complaint or nonconformity logic as applicable
- Maintenance-release or patching expectations: patch releases follow the same release-readiness and final-release controls, scaled to impact
- Feedback loop into risk management and V&V: significant anomalies reopen risk analysis, regression scope, and release assumptions before shipment
7.5 Release Planning Interface¶
Example:
- Planned release-readiness decision reference:
records/configuration/release_plan.md - Planned final release decision reference:
records/configuration/final_release_decision.md - Entry conditions for formal release-candidate V&V: candidate scope frozen, included and deferred changes named, binary or deployment reference recorded, open anomaly posture reviewed
8. Separate Linked Plans¶
Example:
- Risk management plan reference:
records/risk/risk_management_plan.md - Verification and validation plan reference:
records/verification_validation/vv_plan.md - Usability engineering plan or file reference:
records/usability/usability_file_index.md - Other linked plans or supporting records:
records/configuration/release_plan.md,records/mdf/medical_device_file_index.md
9. Expected Product Dossier / MDF Deliverables and Linked Records¶
Use the controlled record names already adopted in the product repository where possible. If a product uses different filenames or combines records, keep the same intent and traceability rather than copying these names mechanically.
The table below lists expected deliverable areas, not a rigid one-file-per-row mandate.
MDF means medical device file.
| Deliverable Area | Typical Record Name(s) | Main Purpose | Normative / Regulatory Anchor |
|---|---|---|---|
| Intended use and claims | intended_use.md or equivalent controlled product statement |
Define product purpose, users, use environment, and claims | SOP-008 design inputs; SOP-007 MDF structure; FDA QMSR as implemented through 21 CFR part 820 incorporating ISO 13485:2016 |
| Classification and regulatory pathway | classification_decision.md or equivalent regulatory decision record |
Capture jurisdictional classification and pathway rationale | SOP-007 MDF structure; product-specific regulatory dossier expectations |
| Design and development planning | design_development_plan.md |
Define lifecycle model, roles, gates, and operating model | ISO 13485 7.1, 7.3; IEC 62304 5; SOP-008; SOP-020 |
| User needs | user_needs.md |
Define user and intended-use driven needs | ISO 13485 7.3; SOP-008 |
| System and software requirements | system_requirements_spec.md |
Define testable functional, safety, security, usability, and interface requirements | ISO 13485 7.3; IEC 62304 5; SOP-008; SOP-020 |
| Software architecture | software_architecture_spec.md |
Define components, interfaces, external dependencies, and architecture decisions | IEC 62304 5; SOP-008; SOP-020 |
| Design traceability | design_traceability_matrix.md |
Link user needs, requirements, risks, tests, and releases | ISO 13485 7.3; IEC 62304 5, 7, 8; SOP-007; SOP-008; SOP-020 |
| Risk management file | risk_management_plan.md, risk_register.md, risk_management_review.md, or equivalent linked records |
Define and maintain product risk method, analysis, controls, and residual risk decisions | ISO 13485 7.1, 7.3; ISO 14971; SOP-018 |
| Verification and validation | vv_plan.md, test_case_index.md, execution logs, vv_report.md, or equivalent linked records |
Define and record verification, validation, and usability-validation evidence | SOP-008; SOP-020; WI-001; IEC 62304 lifecycle evidence expectations |
| Release and configuration control | release_plan.md, release_baseline_manifest.md, final_release_decision.md |
Record formal V&V entry, release baseline, exact binary or deployment, and shipment authorization | SOP-020; WI-002; IEC 62304 configuration, release, and problem-resolution interfaces |
| Medical device file index and summary | medical_device_file_index.md, traceability_summary.md |
Tie the product dossier together and point to current controlled artifacts | ISO 13485 4.2.3; SOP-007 |
| Linked post-market and quality follow-up records | complaint, PMS, incident, CAPA, and nonconformity references when applicable | Maintain lifecycle continuity after release; these are linked records rather than part of the initial design baseline | SOP-012; SOP-013; SOP-014; SOP-015; SOP-002 |
10. Milestones and Entry/Exit Criteria¶
| Milestone | Entry Criteria | Exit Criteria |
|---|---|---|
| Design inputs baselined | intended use approved; user needs reviewed | requirements baselined; open assumptions documented |
| Architecture ready | requirements baselined | architecture and interfaces reviewed |
| Formal V&V entry ready | release-readiness scope approved; binary identified | formal V&V can start against recorded candidate |
| Release ready | V&V complete; residual risk reviewed | final release decision can proceed |
11. Open Assumptions and Deferred Inputs¶
Example:
- Assumption or deferred input: production SSO provider remains provisional until supplier review closes
- Owner: engineering lead plus QA lead
- Due milestone: verification readiness
- Resolution path: finalize supplier decision, update architecture and access-control requirements, assess regression scope if changed
12. Approval Record¶
Example:
- Baseline approved for controlled implementation: yes
- Approval date:
YYYY-MM-DD - Linked approving PR:
#123 - Notes: approval covers the baseline records listed in Gate 1; changes after approval require a new controlled revision